[1]
2013. Evaluating Traffic Operation for Multilane Highway (Ramadi – Fallujah) Highway as Case Study. Iraqi Journal of Civil Engineering. 9, 1 (Dec. 2013), 120–134. DOI:https://doi.org/10.37650/ijce.2013.80394.