Khuder, S.S., Ibrahim, A. and Eedan, O. (2022) “Adopting a Method for Calculating the Impact of Change Orders on the Time it Takes to Complete Bridge Projects”, Iraqi Journal of Civil Engineering, 15(2), pp. 52–58. doi:10.37650/ijce.2021.172873.