Iraqi Journal of Civil Engineering
Login
Iraqi Journal of Civil Engineering
  • Home
  • Articles & Issues
    • Latest Issue
    • All Issues
  • Authors
    • Submit Manuscript
    • Guide for Authors
    • Authorship
    • Article Processing Charges (APC)
  • Reviewers
    • Guide for Reviewers
    • Become a Reviewer
    • Reviewers of IJCE
  • About
    • About Journal
    • Aims and Scope
    • Editorial Team
    • Journal Insights
    • Peer Review Process
    • Publication Ethics
    • Plagiarism
    • Allegations of Misconduct
    • Appeals and Complaints
    • Corrections and Withdrawals
    • Open Access
    • Archiving Policy
    • Journal Funding Sources
    • AI Usage and Disclosure Policy
    • Announcements
    • Contact

Search Results for change-order

Article
Adopting a Method for Calculating the Impact of Change Orders on the Time it Takes to Complete Bridge Projects

Saif Saad Khuder, AbdulRahman Ibrahim, Osama Eedan

Pages: 52-58

PDF Full Text
Abstract

If the employer believes that changing the shape, quality, or quantity of the work or some part of it is appropriate, he has the authority to order the contractor to do so. These instructions would extend the time it takes to accomplish the task and, as a result, the project's completion time. In the majority of situations, the employer and the contractor couldn't agree on how to compute the extra time the contractor was provided as a result of change orders. The aim of this research is to find a mechanism to determine the additional time required to carry out these works, which will vary based on the type of work, the increase in quantity for any work within the contract, etc.. Modify the nature, quality or type of any work, change the levels, lines, position and dimensions of any part of the work, and perform any additional work necessary to finish the works. A field visit and survey will be conducted on the various bridge projects as part of the research to determine the types of change orders and the additional time required for each of them, in addition to the most important reasons for not using the relative change length and how each project differs from the other. Mathematical software can be enhanced to reliably calculate the additional time for each form of change order. Most of the works expected to appear in variation order are steel and concrete works, and asphalt cladding works, with a frequency of each of them (25 percent), followed by excavation works, which have a frequency of  (16.66 percent)  in bridge projects.

1 - 1 of 1 items

Search Parameters

×

The submission system is temporarily under maintenance. Please send your manuscripts to

Go to Editorial Manager
Journal Logo
Iraqi Journal of Civil Engineering

University of Anbar

  • Copyright Policy
  • Terms & Conditions
  • Privacy Policy
  • Accessibility
  • Cookie Settings
Licensing & Open Access

CC BY NC 4.0 Logo Licensed under CC-BY-NC 4.0

This journal provides immediate open access to its content.

Editorial Manager Logo Elsevier Logo

Peer-review powered by Elsevier’s Editorial Manager®

       
Copyright © 2026 College of Engineering, University of Anbar, its licensors, and contributors. All rights reserved, including those for text and data mining, AI training, and similar technologies. For all open access content, the relevant licensing terms apply.