Iraqi Journal of Civil Engineering
Login
Iraqi Journal of Civil Engineering
  • Home
  • Articles & Issues
    • Latest Issue
    • All Issues
  • Authors
    • Submit Manuscript
    • Guide for Authors
    • Authorship
    • Article Processing Charges (APC)
  • Reviewers
    • Guide for Reviewers
    • Become a Reviewer
    • Reviewers of IJCE
  • About
    • About Journal
    • Aims and Scope
    • Editorial Team
    • Journal Insights
    • Peer Review Process
    • Publication Ethics
    • Plagiarism
    • Allegations of Misconduct
    • Appeals and Complaints
    • Corrections and Withdrawals
    • Open Access
    • Archiving Policy
    • Journal Funding Sources
    • AI Usage and Disclosure Policy
    • Announcements
    • Contact

Search Results for construction-delay

Article
Review Article: Investigating the Delay Factors of Construction Projects Using Narrative Analysis Approach

Bevian Ismail Al-Hadithi .

Pages: 20-28

PDF Full Text
Abstract

Construction delays are common problems in civil engineering projects in Arab countries. Because of the importance of this problem, the study reviewed many studies that dealt with the topic of delay in the construction projects of their countries.The study included the delay in projects in Iraq. Jorden, Palestine, Saudi Arabia, United Arab Emirates, Qatar, Yemen, Egypt, Sudan, Algeria and Morocco. The projects included infrastructure facilities, public buildings, housing complexes, water treatment plants, sports facilities, water supply, roads. Quantitative method via a structured questionnaire was implemented in all these studies, the questionnaires were distributed to experienced project parties such as the owner, contractor, consultant and other parties. The relative importance method was used to analyze the results of the questionnaire to obtain the highest ten or five factors with the highest rank which cause delay. The results showed that the groups of contractor and owner has the highest percentage and were repeated several times compared to the rest of the groups.The top five factors causing delay of construction projects in Arab countries are, problems of cash flow and financial by owner, difficulties in financing the project by the contractor, Poor site management and supervision of the contractor, selecting the contractor who has the lowest bid and ineffective planning and scheduling by contractors    

1 - 1 of 1 items

Search Parameters

×

The submission system is temporarily under maintenance. Please send your manuscripts to

Go to Editorial Manager
Journal Logo
Iraqi Journal of Civil Engineering

University of Anbar

  • Copyright Policy
  • Terms & Conditions
  • Privacy Policy
  • Accessibility
  • Cookie Settings
Licensing & Open Access

CC BY NC 4.0 Logo Licensed under CC-BY-NC 4.0

This journal provides immediate open access to its content.

Editorial Manager Logo Elsevier Logo

Peer-review powered by Elsevier’s Editorial Manager®

       
Copyright © 2026 College of Engineering, University of Anbar, its licensors, and contributors. All rights reserved, including those for text and data mining, AI training, and similar technologies. For all open access content, the relevant licensing terms apply.